S.N. |
Title |
Type |
Date of Publish |
Valid Upto |
Download |
1 |
Repair and restoration of BOSCH make Fire Alarm system installed at IIT Bhubaneswar, Argul Campus |
Work |
23/04/2024 |
07/05/2024 |
[ Download ]
|
2 |
Repairing of 1010 KVA DG set installed at LCS-3 of IIT Bhubaneswar , Argul campus. |
Work |
15/02/2024 |
22/02/2024 |
[ Download ]
|
3 |
Repairing of 250 KVA DG set installed at LCS-2 of IIT Bhubaneswar |
Work |
15/02/2024 |
22/02/2024 |
[ Download ]
|
4 |
Making foundation for Hydraulic press at SMMME building |
Work |
06/02/2024 |
13/02/2024 |
[ Download ]
|
5 |
External painting and repair work in Guest House of IIT Bhubaneswar |
Work |
24/01/2024 |
05/02/2024 |
[ Download ]
|
6 |
Making foundation for Hydraulic press at SMMME building |
Work |
23/01/2024 |
30/01/2024 |
[ Download ]
|
7 |
Painting of Room No.202, 204 and other miscellaneous repair works of different buildings inside IIT Bhubaneswar at Argul. |
Work |
18/01/2024 |
29/01/2024 |
[ Download ]
|
8 |
Relocation of 16-meter High masts (02 numbers) from existing location to the Centre of the circle near L-gate & provision of additional higher wattage lights in the High Masts at IIT BHUBANESWAR, ARGUL CAMPUS |
Work |
18/01/2024 |
02/02/2024 |
[ Download ]
|
9 |
Applying synthetic enamel paint for battle tank near Main gate at IIT Bhubaneswar. |
Work |
12/01/2024 |
16/01/2024 |
[ Download ]
|
10 |
Supply & installation of trilingual internal signage with sun board in the corridors, toilets and different rooms of Auditorium building. |
Work |
12/01/2024 |
16/01/2024 |
[ Download ]
|
11 |
Enamel painting of kerb stones from Main gate to Main building, Main building surrounding road & Helipad to Main building of IIT Bhubaneswar |
Work |
11/01/2024 |
15/01/2024 |
[ Download ]
|
12 |
Writing of the quarter name infront of the wall of the Residential tower at Argul campus. |
Work |
16/10/2023 |
20/10/2023 |
[ Download ]
|
13 |
Construction of brick wall from external side for closing 4 Nos. of windows of CRIF building for establishing clean room |
Work |
13/10/2023 |
26/10/2023 |
[ Download ]
|
14 |
Installation, testing & commissioning of Old Split Air Conditioners in the Kendriya Vidyalaya IIT BHUBANESWAR at ARGUL |
Work |
11/10/2023 |
17/10/2023 |
[ Download ]
|
15 |
Repairing and servicing of 500 KVA DG set installed at LCS-5 of IIT Bhubaneswar , Argul Campus |
Work |
11/10/2023 |
19/10/2023 |
[ Download ]
|
16 |
Cleaning of septic tank at GHR, SHR, Market Building, Type-D1, D2, C3 and B4 tower at IIT Bhubaneswar |
Work |
18/08/2023 |
25/08/2023 |
[ Download ]
|
17 |
Painting with Antibacterial and antiviral interior paint of Room No.203,211, 212 & 213 and corridor infront of Room No.211, 212 & 213 of SBS Building of IIT Bhubaneswar |
Work |
18/08/2023 |
29/08/2023 |
[ Download ]
|
18 |
Construction of a shed of 2.0m x 2.0m for installation of chiller unit for Dynamic lab of SIF Extension building |
Work |
18/08/2023 |
28/08/2023 |
[ Download ]
|
19 |
Installation, Testing & Commissioning of old split air conditioners in the different club houses of IIT Bhubaneswar at Argul |
Work |
11/08/2023 |
17/08/2023 |
[ Download ]
|
20 |
Sealing of fire duct shaft for fire compliance of existing building of Phase-I construction at Argul campus. |
Work |
08/08/2023 |
22/08/2023 |
[ Download ]
|
21 |
Installation, Testing & Commissioning of Old Split Air Conditioners in the different Club Houses of IIT BHUBANESWAR AT ARGUL |
Work |
28/07/2023 |
08/08/2023 |
[ Download ]
|
22 |
Installation of 02 nos. of 1.5 Tr old split ACs in Room no-210 of SBS building at IIT Bhubaneswar,Argul |
Work |
25/07/2023 |
01/08/2023 |
[ Download ]
|
23 |
Construction of Pathway between Sangam Hostel and SHR Hostel at Argul Campus |
Work |
12/07/2023 |
17/07/2023 |
[ Download ]
|
24 |
Construction of temporary shed for tea and snacks stall at SES Building |
Work |
16/06/2023 |
04/07/2023 |
[ Download ]
|
25 |
Supply, Installation, Testing & Commissioning of Gas bank system and supply -air & exhaust-air system in the kitchen of GHR, BHR & RHR Hostel of IIT BHUBANESWAR, ARGUL CAMPUS |
Work |
16/06/2023 |
03/07/2023 |
[ Download ]
|
26 |
Providing signage with projected acrylic letters with LED module for Sanjeevan Health Centre and enamel painting letters for Sangam Hall of Residence of IIT Bhubaneswar |
Work |
06/06/2023 |
22/06/2023 |
[ Download ]
|
27 |
Providing and fixing of Signboards for SEOCS, SHSSM and SMMME Building of IIT Bhubaneswar |
Work |
29/05/2023 |
09/06/2023 |
[ Download ]
|
28 |
Providing, fitting and fixing of Signboards and name plate for Director Bungalow of IIT Bhubaneswar |
Work |
25/05/2023 |
02/06/2023 |
[ Download ]
|
29 |
Providing Aluminium partition and painting in Room No.208 for School of Infrastructure Building of IIT Bhubaneswar |
Work |
24/05/2023 |
31/05/2023 |
[ Download ]
|
30 |
Providing and fixing of Signboards for SEOCS, SHSSM and SMMME Building of IIT BhubaneswarCorrigendum
|
Work |
27/04/2023 |
12/05/2023 |
[ Download ]
|