Degree | Discipline | Year | School |
---|---|---|---|
Ph.D. | Civil Engineering | 2013 | IIT Delhi |
M.Tech. | Geotechnical Engineering | 2007 | IIT Delhi |
B.Tech. | Civil Engineering | 2005 | Jalpaiguri Govt. Engg. College |
Sponsored Projects | |||
Sr. No. | Project Title | Amount | Sponsor |
1 | Design and development of a low cost easy to install, sustainable river bank protection system | Rs. 38.25 lac | CRG, SERB |
2 | Design and Development of Low-Cost, Easy to Install, Sustainable Foundations for Renewable Energy Devices | Rs. 58.98 lacs | SPARC, Ministry of Human Resource Development |
3 | UKIERI Support for SPARC project “Design and Development of Low-Cost, Easy to Install, Sustainable Foundations for Renewable Energy Devices” | Rs. 12 lacs | UKIERI |
4 | Safeguarding heritage structures using seismic metamaterials | Rs. 52.84 lacs | SPARC, Ministry of Human Resource Development |
5 | Stability analysis of reinforced soil wall under seismic loads - a novel approach | Rs. 40.34 lacs | ECR, Science and Engineering Research Board, DST, Gov. of India |
6 | A Study on Fly ash-Geosynthetics Interaction Characteristics Pertinent to Bridge Abutment | Rs.10 lacs | Seed grant, Indian Institute of Technology Bhubanneswar |
Consultancy projects | |||
Sr. No. | Project Title | Amount | Agency |
1 | Monitoring settlement of ballastless track constructed over embankment in connection with Nopara to Dakshineswar Metro Project of Kolkata Metro | 7.08 lacs | M/S Rail Vikas Nigam Ltd. |
2 | Checking of design of process tower and boiler chimney at Somnathpur Industrial area, Balasore. | 5.90 lacs | IFB AGRO INDUSTRIES LIMITED |
3 | Proof checking of Design and Drawings of Slope stabilization work at Pakyong Airport, Sikkim |
6.0 lacs | REINFORCED EARTH INDIA PRIVATE LIMITED |
4 | Design Check of VUP for four Laning of NH6 in Odisha, Sambalpur | 4.72 lacs | NHAI |
5 | Study the cause of defect on the wing walls of Br. 5 over Angul-Balaram SSection of MCRL corridor and suggestion on remedial measure for the structure | 4.13 lacs | M/s Ircon International Ltd. |
6 | Safety analysis of steel pipeline crossing rail road between Surat and Vadodara | 4.13 lacs | M/s Dedicated Freight Corridor Corporation India Limited (DFCCIL) |
7 | Conducting feasibility study on utilization of OB material of Kulda OCP for various Civil construction purposes | 35.35 lacs | Mahanadi Coal fields |
8 | Slope stability analysis for new BG Line from Nuagaon to Paradeep (Code: CP126) | 3.98 lacs | M/s ARSS Infrastructure Project Ltd. |
9 | Peer review of plant and non-plant buildings | 3.78 lacs | Tractable Engineering Private Ltd |
10 | Improvement of Tara Tarini Temple Ring Road (Regarding with protection works- Hill top portion) in the district of Ganjam, (Code: CP 122) | 3.54 lacs | Rural Works Division-I, Ganjam, Berhampur. Govt. of Odisha |
11 | Assessment of soil strength using MASW test at Cuttack | 3 lacs | AIMIL Ltd |
12 | Checking of design of major and minor railway bridges, retaining wall and various buildings for Ananta OCP of Jagannath Area, MCL | 27.73 lacs | IRCON |
13 | Investigation of RE wall failure at km 349+580 LHS Singhara-Binjhabahal section | 2.95 lacs | National Highways Authority of India (NHAI) |
14 | Study of stability of reservoir of an abandoned post-mined iron ore pit (CP682) | 13.27 lacs | JSW STEEL LIMITED |
15 | Soil improvement methodology in WTP area of Balianta Block of Khorda Project | 12.16 lacs | NCC Limited |
16 | Development of foundation design and drawing for 220 kv and 400 kv towers in wind zone VI | 10 lacs | M/S Odisha power transmission corporation Ltd. (OPTCL) |
17 | Proof checking of 3 different height retaining walls at CRWC-Mancheswar | 1.77 lacs | M/s RITES Limited |
18 | Determination of Physical Characteristics of Filter Media for Water Supply Projects in Odisha | 1.65 lacs | GVPR Engineers Ltd |
19 | Stability Analysis of Core formation with sand and local earth for new BG Rail line from Nuagaon to Paradeep | 1.65 lacs | M/s Rail Vikas Nigam Limited(RVNL) |
20 | Testing of flyash as per IRC SP 58-2001 to use as an embankment fill material | 1.29 lacs | RKD Construction pvt. Ltd |
21 | Vetting of design of embankment for rail track in Ananta CHP Talcher | 1.18 lacs | Mahanadi Coalfields Limited |
22 | Site visit and suggestion for bank slope failure at 147 km to 149 km of TGRL-TKMA doubling project | 0.7 lacs | Rail Vikas Nigam Limited |